PAWTRACK MINI – GPS Tracker for Real-Time Cat Location Monitoring

PAWTRACK MINI – GPS Tracker for Real-Time Cat Location Monitoring

Sale price  £54.95 Regular price  £81.95
Skip to product information
PAWTRACK MINI – GPS Tracker for Real-Time Cat Location Monitoring

PAWTRACK MINI – GPS Tracker for Real-Time Cat Location Monitoring

Sale price  £54.95 Regular price  £81.95

PAWTRACK MINI – REAL-TIME GPS TRACKING FOR CATS

The PAWTRACK MINI GPS tracker is designed specifically for cats, providing accurate real-time location updates through satellite technology. With its compact 2 × 2 cm size and lightweight design, it attaches easily to any collar without disturbing your pet. Made from durable ABS material, it’s built for daily use and ensures your cat’s safety wherever they roam. Ready to use within minutes—simply insert a Nano SIM card and start tracking, with no subscription fees required.

WHY CHOOSE PAWTRACK MINI?

  • Real-time GPS tracking – Accurate live location
  • Ultra-compact & lightweight – Comfortable for daily wear
  • Quick setup – Insert SIM and start tracking
  • No subscription required – One-time purchase
  • Durable ABS design – Built for everyday outdoor use

SPECIFICATIONS

  • Material – ABS plastic
  • Size – 65.5 × 37 × 18.3 mm
  • Network – 2G Nano-SIM, GPS + BDS + LBS
  • Battery – 500 mAh, 15 hours–5 days standby
  • Note: Only available to several places

WHAT’S IN THE BOX?

  • 1 × PAWTRACK MINI GPS Tracker
  • 1 × USB Charging Cable
  • 1 × User Manual

You may also like